20w Sensor Led Floodlight Daylight 4000k and similar items
20w Sensor Led Floodlight Daylight 4000k Outdoor Waterproof (TIME, DISTANCE AND
$105.77
View full item details »
Shipping options
Seller handling time is 3 business days Details
$15.00 via Unspecified shipping type to United States
Ships from
Turkey

Offer policy
OBO - Seller accepts offers on this item.
Details
Return policy
Purchase protection
Payment options
PayPal accepted
PayPal Credit accepted
Venmo accepted
PayPal, MasterCard, Visa, Discover, and American Express accepted
Maestro accepted
Amazon Pay accepted
Nuvei accepted
View full item details »
Shipping options
Seller handling time is 3 business days Details
$15.00 via Unspecified shipping type to United States
Ships from
Turkey

Offer policy
OBO - Seller accepts offers on this item.
Details
Return policy
Purchase protection
Payment options
PayPal accepted
PayPal Credit accepted
Venmo accepted
PayPal, MasterCard, Visa, Discover, and American Express accepted
Maestro accepted
Amazon Pay accepted
Nuvei accepted
Item traits
Category: | |
---|---|
Quantity Available: |
120 in stock |
Condition: |
Unspecified by seller, may be new. |
UPC: |
174259002402 |
grams: |
0 |
weight: |
0.0 |
Weight Unit: |
kg |
Title: |
Default Title |
Listing details
Shipping discount: |
No combined shipping offered |
---|---|
Posted for sale: |
More than a week ago |
Item number: |
1696868764 |
Item description
Osram 20W Ledvance Led Floodlight with Motion Sensor 4000 Kelvin Daylight - Black Case Product benefits Easy adjustment of range, daylight and motion detection with rotary switch Tempered glass frosted cover for even illumination No top light output rate (ULOR 0%) when mounted at 0 inclination Up to 90% energy savings compared to halogen lamp projectors 3-year warranty Application areas Replacement of halogen lamp projectors Car parks and underpasses Garages Public areas Construction areas D-mark according to EN 60598-2-24 for fire-risk commercial unit, dust accumulation Product Features Symmetrical beam angle: 100 x 100 Luminaire effectiveness: PIR motion and daylight sensor up to 110 lm / W Sensor deactivation by switch setting Angled (30 ) mounting bracket and tilting up to 180 Protection type: IP65 Impact resistance: IK07 / IK05 Ambient temperature during operation: -30? + 50 C Connection with 1 m cable, wiring required 20 Watt 2200 Lumens 4000 Kelvin Yellow Light Ip65 Protection Special Possesses His. Water Resistant. Light Emitting Capacity: Operates at 100 degrees -30.....+ 50 degrees temperatures. 50 000 Hours Working Life Ra 80 220-240 Volt 50/60 Hz Non Dimmable IK 07 / IK05 Has 90% Energy Efficiency. Dimensions: 176 * 156 * 55 mm Time, Lighting and Distance can be adjusted. Angle of Light: 40......60 degrees Luminous Intensity: 10........1200 lux Distance: 2.......12 meters Time: 10 seconds........ It can be changed between .12 minutes. Maximum 50 pieces of this product can be ordered. swordslife reserves the right to cancel orders over 50 pieces. There is less than 5 stocks to be sold at the campaign price. The seller determines the selling price of the product you have examined. This product is not included in the discount campaign.
Loading
This item has been added to your cart

View Cart or continue shopping.

Get an item reminder
We'll email you a link to your item now and follow up with a single reminder (if you'd like one). That's it! No spam, no hassle.
Already have an account?
Log in and add this item to your wish list.